SkullandBonesSkateboards.com Forum Index
SkullandBonesSkateboards.com Forum Index  »  SCREEN PRINTING  »  Stages of skateboard construction.
 Post new topic   Reply to topic
Page 1 of 1    

Stages of skateboard construction.

Author Message
livi-skater
Posted: Tue Mar 16, 2004 11:03 am Reply with quote
Joined: 07 Mar 2003 Posts: 236 Location: Scotland
I plan to start manufacturing skateboards later this year when I get enough money put away. I started a list of what I know and what I don't know (almost everything) about the stages, processes and costs involved in manufacturing skateboards.

Here is my list so far, please tell me what I have missed out, or help answer anything I don’t have written down and I shall update it for all to see.

Thanks to waxux for previous help.



Skateboard Manufacture

Veneer

What veneer = The standard is 7 plies hard rock maple from great lakes of North America. Is there alternates locally, Scandinavian birch?
Suppliers.. Any locally?
Size = at least 35” X 10”
Cost..
Grit = 220?

Staining

Type = Why dye should be used?
Application = Dye box?
Duration = How long should wood be left to dye.

Glue + Catalyst

What glue = National Casein, make specialized skateboard glues and catalysts.. http://www.nationalcasein.com . Is there local suppliers?

Catalysts = k1, k4 or k10
Glue application = paint rollers?

Press

Hydraulics.. What psi/ton hierodulic pump is needed. 200/300 psi or 2000 ( http://www.boardpass.com/riotlounge/b...teboardlarge.html )
Press frame.. Custom constructed from steel?
Molds.. = Steel custom Built? Construct from plywood and top with aluminum? Mold from concrete using an uncut blank from another factory?
How will I attach the hydraulics to the frame and molds?
Heat press = bad?

Lamination

Board construction

face
cross
cross
center
cross
cross
face

or

Face
centre
Cross band
Centre
Crossband
Centre
Face.

?????????????

Separate decks on the press with grease paper?
Quantity = 4 boards per press?
Duration = Time spent in the press.. 2 hours?

Curing

After lamination leave to cure for 24 hours?
What conditions are best to let cure?

Cutting

1 - Rough cut with bandsaw.
2 - Mark with template.
3- Cut around template.

Bandsaw cost = approximately £250

Drilling

Where can I get a 4 bit drill press, or should it be done individually?
Supplier?
Drill cost = approximately £100

Rounding Edges

Equipment = router and belt sander?
Cost = (Belt sander = approximately £100) (Router approximately £100)
Supplier = Industrial tool shop or ebay.
Method = Make a jig with the router facing mouth up out of a table, move board edge around the router bit. Use a ¼ inch router bit? Use belt sander to smoothen out and finish the deck.

Dip Coating

Equipment?
Cost?
Suppliers?

Lacquer

What substance is used?
Application = Spayed??
Does this require a spray room with extractor fan?
Supplier?
Equipment costs?

Screen printing

Minimum 110 mesh count, higher mesh count = higher quality. A higher mesh count should be used for more complex graphics.

This section is vast, I won’t touch anymore of it right now.

Shrink Wrap

Equipment?
Cost?
Suppliers?





[ This Message was edited by: livi-skater on 2004-03-16 11:04 ]

[ This Message was edited by: livi-skater on 2004-03-16 11:53 ]

[ This Message was edited by: livi-skater on 2004-03-16 12:31 ]

[ This Message was edited by: livi-skater on 2004-03-16 14:13 ]
View user's profile Send private message Send e-mail Visit poster's website MSN Messenger
 
Post new topic   Reply to topic
Page 1 of 1    
All times are GMT - 5 Hours
The time now is Fri May 09, 2025 10:56 pm
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum